Store Renovation
Every metre of shelving earns revenue — we turn renovation into an investment that grows selling space and guides the customer.

Store renovation runs on three clocks: mandatory 22:00–08:00 night work in malls, pressure to minimise shutter-down time on high streets, and an opening date that can't slip on either. EMC Decor crews are fluent in mall management procedures (insurance, access permits, debris protocols) and offer night-shift work as a standard service.
Three layers serve the psychology of selling: the shopfront (your brand's face on the street), lighting (colour temperature and CRI values that flatter the product) and custom-built shelving and display systems. Our made-to-measure systems turn the corners and niches that standard modules waste into selling space.
Application Video
Why EMC Decor
Mall night shifts (22:00–08:00) are our standard service
Custom shelving and display systems, made to measure
Product-first lighting: the right Kelvin and CRI plan
Exact brand-manual compliance with a photo conformity report
Process
Survey & Mall Approval
Measurement, brand-standard analysis and preparation of the mall/municipal approval file.
Duration: 3–5 days
Fabrication
Shelving, counters and shopfront elements fabricated in the workshop while site infrastructure is prepared.
Duration: 1–3 weeks
Site Works
Floors, walls, ceilings, lighting and installation — night shifts included, one schedule.
Duration: 2–5 weeks
Handover & Opening
Brand conformity check, cleaning and a touch-up crew before opening.
Duration: 1–2 days
Realized Work & Process
Store projects are priced by m², custom fabrication scope and working hours.
View PricingFrequently Asked Questions
We don't know mall procedures — how does it work?
We manage all of it: insurance policies, contractor registration, night-work permits, freight-lift bookings and debris protocols. You only sign off on brand approvals.
How fast can a store be delivered?
A standard mall unit (100–200 m²) is delivered in 3–6 weeks including fabrication; a visual-only refresh (paint, floor, lighting) can be done in 7–10 nights.
Can you renovate multiple chain locations in parallel?
Yes — our brother-led team structure lets us run two or three locations simultaneously, with identical brand standards and reporting across all of them.
Are shopfront glazing and signage included?
Yes — shopfront framing and glazing plus signage fabrication and installation are delivered within one project scope via our partners.
Related Services

Commercial Renovation
In commercial work the schedule is revenue: every closed day is a cost. We work to fixed handover dates, without stopping your business.

Office Renovation
Leave on Friday evening, walk into a new office on Monday morning — we renovate section by section, with zero downtime.

LED Cove Lighting
In good cove lighting you never see the lamp — only the light gliding down the wall.

Suspended Ceilings
The ceiling is the room's fifth wall — it carries the light, hides the services and sets the character from above.
Let’s Talk About Your Project
Fill in the form for a free survey appointment, or reach us directly on WhatsApp.

