Office Renovation
Leave on Friday evening, walk into a new office on Monday morning — we renovate section by section, with zero downtime.

An office renovation carries two costs: the visible works budget and the invisible productivity loss. To zero out the second, we split the job into after-hours, weekend and section-based stages — your teams return each morning to a clean, functioning space.
Technically, the modern office has three critical layers: sound (acoustic partitions and ceiling solutions), light (cove lighting and fixture layouts planned for eye comfort) and infrastructure (data and power runs routed to the desk plan). EMC Decor brings all three into one project; from meeting-room acoustics to floor finishes, every item sits in the written process plan.
Application Video
Why EMC Decor
After-hours and weekend work — no lost business days
Measurable acoustic comfort via partitions and ceilings
Data and power infrastructure engineered to the desk plan
Cove lighting and fixtures planned for eye comfort
Process
Survey & Layout
Current plan, headcount and work patterns analysed; the new layout drawn.
Duration: 2–3 days
Staging Plan
Section stages, after-hours shifts and the move/transition plan agreed.
Duration: 1–2 days
Execution
Partitions, ceilings, infrastructure, floors and paint proceed by stage; clean handback every morning.
Duration: 2–6 weeks
Handover
Final stage handover, checklist and 12-month warranty.
Duration: 1 day
Realized Work & Process
Office projects are priced per m² and scope; after-hours premiums are fixed in the quote.
View PricingFrequently Asked Questions
Is renovating a working office really feasible?
Yes — it's our most common model. The space is sectioned, noisy and dusty work shifted after hours, and the workspace handed back clean every morning. Low-VOC materials are used where odour matters.
How long does it take to divide an open office into rooms?
With acoustic drywall, a typical meeting room is delivered in 3–4 days including door and paint; glass partition systems add manufacturing lead time.
Are data cabling and electrics included?
Yes — power and data points are engineered to the desk layout and delivered with test reports; server-room cooling and power arrangements are also available.
Do you build custom joinery and units?
Reception desks, storage walls and meeting tables are made to measure and installed by our team.
Related Services

Drywall Partition Walls
Splitting a room in two is a four-day job — with the right system, the new room is separated by sound as well as sight.

Suspended Ceilings
The ceiling is the room's fifth wall — it carries the light, hides the services and sets the character from above.

LED Cove Lighting
In good cove lighting you never see the lamp — only the light gliding down the wall.

Commercial Renovation
In commercial work the schedule is revenue: every closed day is a cost. We work to fixed handover dates, without stopping your business.
Let’s Talk About Your Project
Fill in the form for a free survey appointment, or reach us directly on WhatsApp.

