Office Renovation

Leave on Friday evening, walk into a new office on Monday morning — we renovate section by section, with zero downtime.

Office Renovation

An office renovation carries two costs: the visible works budget and the invisible productivity loss. To zero out the second, we split the job into after-hours, weekend and section-based stages — your teams return each morning to a clean, functioning space.

Technically, the modern office has three critical layers: sound (acoustic partitions and ceiling solutions), light (cove lighting and fixture layouts planned for eye comfort) and infrastructure (data and power runs routed to the desk plan). EMC Decor brings all three into one project; from meeting-room acoustics to floor finishes, every item sits in the written process plan.

FROM THE FIELD

Application Video

Why EMC Decor

After-hours and weekend work — no lost business days

Measurable acoustic comfort via partitions and ceilings

Data and power infrastructure engineered to the desk plan

Cove lighting and fixtures planned for eye comfort

Process

  1. Survey & Layout

    Current plan, headcount and work patterns analysed; the new layout drawn.

    Duration: 2–3 days

  2. Staging Plan

    Section stages, after-hours shifts and the move/transition plan agreed.

    Duration: 1–2 days

  3. Execution

    Partitions, ceilings, infrastructure, floors and paint proceed by stage; clean handback every morning.

    Duration: 2–6 weeks

  4. Handover

    Final stage handover, checklist and 12-month warranty.

    Duration: 1 day

Office projects are priced per m² and scope; after-hours premiums are fixed in the quote.

View Pricing

Frequently Asked Questions

Is renovating a working office really feasible?

Yes — it's our most common model. The space is sectioned, noisy and dusty work shifted after hours, and the workspace handed back clean every morning. Low-VOC materials are used where odour matters.

How long does it take to divide an open office into rooms?

With acoustic drywall, a typical meeting room is delivered in 3–4 days including door and paint; glass partition systems add manufacturing lead time.

Are data cabling and electrics included?

Yes — power and data points are engineered to the desk layout and delivered with test reports; server-room cooling and power arrangements are also available.

Do you build custom joinery and units?

Reception desks, storage walls and meeting tables are made to measure and installed by our team.