Factory Renovation

The production line doesn't stop — the renovation adapts to your production plan, not the other way round.

Factory Renovation

In factory renovation the unit of measure is the production hour: every stoppage must be planned, every shift gap used. EMC Decor synchronises with your production plan on industrial projects — major operations at weekends, zone-based work on night shifts, complete conversions during summer shutdowns.

Our scope runs from the production floor to staff facilities: impact- and chemical-resistant epoxy flooring systems, painting of steel structures and machinery, fire-code-compliant partition walls, management offices, canteens and changing rooms. All crews are HSE-trained and certified; we comply fully with your site rules and integrate with your permit-to-work systems.

FROM THE FIELD

Application Video

Why EMC Decor

Shift work synced to production — we don't stop the line

Impact- and chemical-resistant industrial epoxy floor systems

HSE-certified crews, integrated with permit-to-work systems

Designs compliant with fire and workplace-safety codes

Process

  1. Site Study

    Production flow, shift pattern and HSE requirements analysed; work windows defined.

    Duration: 3–5 days

  2. Phasing Plan

    Zone phases, temporary barriers and a schedule that avoids production conflicts.

    Duration: 1 week

  3. Execution

    Floors, painting, partitions and facility areas delivered phase by phase; each phase closes with an HSE report.

    Duration: 3–16 weeks

  4. Handover

    Handover with a technical file (material certificates, test reports) and a 12-month warranty.

    Duration: 1–2 days

Industrial projects are priced per m² and per system; epoxy flooring has its own unit-price list.

View Pricing

Frequently Asked Questions

Can floors be renewed without any production stoppage?

With zone phasing, yes: the area is barriered off, fast-curing systems (e.g. methacrylate-based) are applied in a weekend window and opened to forklift traffic by Monday morning.

Do you work in food-production facilities?

Yes — with food-safety-compliant seamless, washable surface systems (hygienic epoxy, antibacterial paint), delivering application certificates in the handover file.

How is steel structure painting done at height?

By certified working-at-height crews from scissor lifts or scaffolding; surface prep (mechanical cleaning/priming) matches the corrosion grade, and coat thicknesses are measured and reported.

Do you have industrial references?

Examples of our production-facility painting and flooring projects are in the portfolio; comparable references are shared at the survey meeting.