Factory Renovation
The production line doesn't stop — the renovation adapts to your production plan, not the other way round.

In factory renovation the unit of measure is the production hour: every stoppage must be planned, every shift gap used. EMC Decor synchronises with your production plan on industrial projects — major operations at weekends, zone-based work on night shifts, complete conversions during summer shutdowns.
Our scope runs from the production floor to staff facilities: impact- and chemical-resistant epoxy flooring systems, painting of steel structures and machinery, fire-code-compliant partition walls, management offices, canteens and changing rooms. All crews are HSE-trained and certified; we comply fully with your site rules and integrate with your permit-to-work systems.
Application Video
Why EMC Decor
Shift work synced to production — we don't stop the line
Impact- and chemical-resistant industrial epoxy floor systems
HSE-certified crews, integrated with permit-to-work systems
Designs compliant with fire and workplace-safety codes
Process
Site Study
Production flow, shift pattern and HSE requirements analysed; work windows defined.
Duration: 3–5 days
Phasing Plan
Zone phases, temporary barriers and a schedule that avoids production conflicts.
Duration: 1 week
Execution
Floors, painting, partitions and facility areas delivered phase by phase; each phase closes with an HSE report.
Duration: 3–16 weeks
Handover
Handover with a technical file (material certificates, test reports) and a 12-month warranty.
Duration: 1–2 days
Realized Work & Process
Industrial projects are priced per m² and per system; epoxy flooring has its own unit-price list.
View PricingFrequently Asked Questions
Can floors be renewed without any production stoppage?
With zone phasing, yes: the area is barriered off, fast-curing systems (e.g. methacrylate-based) are applied in a weekend window and opened to forklift traffic by Monday morning.
Do you work in food-production facilities?
Yes — with food-safety-compliant seamless, washable surface systems (hygienic epoxy, antibacterial paint), delivering application certificates in the handover file.
How is steel structure painting done at height?
By certified working-at-height crews from scissor lifts or scaffolding; surface prep (mechanical cleaning/priming) matches the corrosion grade, and coat thicknesses are measured and reported.
Do you have industrial references?
Examples of our production-facility painting and flooring projects are in the portfolio; comparable references are shared at the survey meeting.
Related Services

Industrial Painting
Industrial painting is a race against corrosion: correct surface prep and coat thickness add years to steel's life.

Epoxy Coating
Epoxy success is 70% surface preparation: grind and prime correctly and the coating stays down for years.

Commercial Renovation
In commercial work the schedule is revenue: every closed day is a cost. We work to fixed handover dates, without stopping your business.

Drywall Partition Walls
Splitting a room in two is a four-day job — with the right system, the new room is separated by sound as well as sight.