Masonry Works
Masonry is the core of this trade: the line is stretched, the level speaks — we've laid to the same discipline for thirty years.

Our company's story began with masonry — the founding brothers learned this work on site, with line and trowel. Today the same hand discipline operates inside a corporate structure: brick, block and stone walling, garden and retaining walls, cutting new door and window openings in existing walls (lintel calculation and temporary propping included) and closing unused openings.
Opening a doorway is the most critical item on that list: even in a non-load-bearing wall, the load above must be transferred correctly. The opening is first propped, a steel or precast lintel is placed, and only then is the cut made — never cut first, think later. Where a load-bearing wall is suspected, we do not start without a structural assessment.
Application Video
Why EMC Decor
Line, level and plumb discipline: flatness measured course by course
Openings: prop and lintel first, cut second — never the reverse
Brick, block, AAC and natural stone — technique matched to material
Structural assessment required where load-bearing is suspected
Process
Survey
Wall type identification, load-bearing check and material recommendation.
Duration: 1 day
Preparation
Protection, temporary propping where needed, setting-out of lines and levels.
Duration: 0.5–1 day
Laying / Cutting
Walling or controlled cutting; lintel installation, tie anchors, debris removal.
Duration: 1–5 days
Plaster & Handover
Plaster, corner beads and paint-ready handover; warranty registration.
Duration: 2–4 days
Realized Work & Process
Real Projects for This Service
Walling is priced per m²; opening and closing works are priced per item.
View PricingFrequently Asked Questions
How do you tell if a wall is load-bearing?
Thickness, material, drawings and the loads above are assessed together; for reinforced shear walls or any doubt, no cutting happens without a structural engineer's opinion.
Do you build exposed decorative brick walls?
Yes — loft-style exposed brickwork and brick-slip cladding; joint colour and texture are approved on a sample first.
Do you build garden and retaining walls?
Yes — including foundation, drainage and coping details; retaining walls over 1 m are always built to an engineered design.
How long does opening a doorway take, and how dusty is it?
A standard doorway takes 1–2 days including propping and lintel; cutting is done with a water-cooled disc, the zone is sheeted off and industrial vacuums run throughout.
Related Services

AAC Block Walls (Ytong)
AAC is the comfortable wall: light enough to spare the structure, porous enough to hold back heat and sound.

Drywall Partition Walls
Splitting a room in two is a four-day job — with the right system, the new room is separated by sound as well as sight.

Gypsum Plaster
The truth beneath the paint: the flatter the wall, the kinder the light — gypsum plaster builds that flatness.

Repair & Maintenance Works
There is no such thing as a small job — a badly repaired crack becomes a major renovation two years later.
Let’s Talk About Your Project
Fill in the form for a free survey appointment, or reach us directly on WhatsApp.