Complete Home Renovation

We strip an old home back to its structure and rebuild it to as-new standard, from utilities to the final coat of paint.

Complete Home Renovation

A complete renovation demands a different engineering discipline than a partial refresh: in 20–30-year-old buildings the electrical and plumbing systems must be re-designed for today's loads, floor screeds re-levelled, and walls re-assessed for plaster and insulation. Getting the invisible infrastructure right before the visible surfaces determines how long the renovation lasts.

EMC Decor plans a full refit layer by layer: each layer's material, curing time and inspection method is part of the written process plan. From wiring runs to tile joints, every application is done by our own teams — you never pay a middleman margin. After handover, warranty follow-up continues for 12 months.

FROM THE FIELD

Application Video

Why EMC Decor

A written layer-by-layer process plan, from infrastructure to finish

Electrics and plumbing re-designed to current standards

Laser-verified level control on screeds and walls

Every layer under one 12-month warranty

Process

  1. Demolition & Assessment

    After controlled demolition, structure, utilities and damp are documented; the plan is revised if needed.

    Duration: 3–5 days

  2. Infrastructure

    New electrical runs, plumbing and low-voltage cabling; pressure and continuity tests performed.

    Duration: 1–2 weeks

  3. Shell & Surfaces

    Walling/drywall, screed, insulation, gypsum plaster and satin finish — each layer applied with proper curing time.

    Duration: 2–4 weeks

  4. Finishing & Handover

    Paint, flooring, tiling, kitchen and bathroom installation and final cleaning; checklist handover.

    Duration: 2–3 weeks

Complete renovation is priced per m², based on your material class. Sample scopes are on the pricing page.

View Pricing

Frequently Asked Questions

What is included in a complete renovation?

Demolition, full electrical and plumbing renewal, screed, wall and ceiling work, insulation, paint, flooring, interior doors, and complete kitchen and bathroom refits — all in one project.

Is it necessary to renew utilities in old buildings?

In buildings over 20 years old we strongly recommend it: old runs can't carry today's appliance loads, and legacy pipework buried under new surfaces means future demolition. We test and document the system at the survey.

How many weeks does a complete renovation take?

For an 80–120 m² apartment the typical duration is 6–10 weeks. The final schedule depends on demolition findings, material lead times and curing periods, and is fixed in the contract.

Can I buy the materials myself?

Yes; you can procure against our brand list if you prefer. Our volume agreements, however, usually beat retail prices on most items — we show both scenarios in the quote.