Home Renovation

One team, one schedule, one line of accountability from survey to handover — every square metre renewed to written standards.

Home Renovation

A home renovation means orchestrating dozens of trades on one schedule, in the right order: demolition, infrastructure, wall and ceiling systems, insulation, plaster, paint, flooring and installation. EMC Decor takes on that chain as a single contractor — the material brand, application method and duration of every stage is put in writing before work begins.

Our founding team learned this trade on construction sites from childhood; today each brother is an expert in his own discipline. A measurement culture built on mathematics and geometry means every stage is verified with straightedge and laser level. The result: no surprise costs, no slipping schedule, and 12 months of warranty follow-up after handover.

FROM THE FIELD

Application Video

Why EMC Decor

One contractor, one responsibility: every trade in-house

Written material list and fixed-timeline commitment before work starts

Level control verified with laser and straightedge

Photo progress reports and a 12-month post-handover warranty

Process

  1. Survey & Measurement

    On-site inspection, per-m² measurement and needs analysis. Existing floors, walls and utilities are documented.

    Duration: 1 day

  2. Quote & Material Approval

    A written material list by brand and model, an itemised price breakdown and a timeline commitment.

    Duration: 2–3 days

  3. Execution

    Demolition → infrastructure → walls/ceilings → insulation → plaster → paint → flooring → installation, with daily photo reports.

    Duration: 4–8 weeks

  4. Handover & Warranty

    Joint handover against a checklist; every application is covered by a 12-month warranty.

    Duration: 12-month follow-up

Home renovation is priced per m² based on scope and material class. See our pricing page for current starting rates.

View Pricing

Frequently Asked Questions

How long does a home renovation take?

A complete refit of a standard apartment takes 4–8 weeks. The exact schedule is committed in writing after the survey, based on scope and material lead times.

Can I keep living at home during the renovation?

For partial renovations we can stage the work room by room; for complete refits we recommend moving out temporarily due to dust, noise and utility interruptions. We prepare a schedule for both scenarios at the survey.

What does the quote include?

The quote itemises labour, a brand-level material list, transport, debris removal and the timeline commitment. No surprise costs appear outside the quote during the project.

Which districts do you cover?

We work across all districts of Istanbul; survey visits are free on both the European and Anatolian sides.