Bathroom Renovation

A bathroom's lifespan is decided by the waterproofing under the tiles, not the tiles — we get the invisible right first.

Bathroom Renovation

The bathroom is a home's smallest but most technically dense space: water, electricity, ventilation and slope calculations all compressed into a few square metres. The most common failure we see is tiling straight over old waterproofing — which ends in a leak to the flat below within two years. At EMC Decor floors and walls get two coats of liquid membrane, a 24-hour ponding test, and a photo-documented report of the result.

Drain slopes are laser-measured (1–2 cm per metre), concealed plumbing is pressure-tested, and tiles are levelled with spacer systems. Sanitaryware and fittings are torqued to manufacturer spec. A standard bathroom remodel takes 7–14 days and carries a 12-month warranty.

FROM THE FIELD

Application Video

Why EMC Decor

Two-coat waterproofing + 24-hour ponding test, photo report

Pressure-tested concealed plumbing, documented before closing up

Laser-measured drain slopes and levelled tiling

Standard bathroom delivered in 7–14 days, 12-month warranty

Process

  1. Survey & Design

    Measurement, plumbing assessment, tile and sanitaryware selection; layout drawn.

    Duration: 1–2 days

  2. Demolition & Plumbing

    Old finishes removed, new concealed plumbing installed and pressure-tested.

    Duration: 2–3 days

  3. Waterproofing & Tiling

    Two coats of membrane, ponding test, screed and slopes, tiling and grouting.

    Duration: 4–6 days

  4. Installation & Handover

    Sanitaryware, fittings, glass and accessories installed; sealing, cleaning and checklist handover.

    Duration: 1–2 days

Bathroom pricing depends on m², tile class and sanitaryware choice. Starter packages are on the pricing page.

View Pricing

Frequently Asked Questions

How many days does a bathroom renovation take?

A standard bathroom is delivered in 7–14 days including demolition. Membrane curing and the ponding test are part of that schedule — we never shorten the job by skipping them.

What if it's the only bathroom in the home?

We sequence the work so the toilet is back in temporary use by the end of day two, and plan the heaviest days around your shower arrangements.

Do you guarantee against leaks to the flat below?

Yes — our waterproofing is proven with a 24-hour ponding test and covered by the 12-month warranty. The test report is part of your handover file.

Can you replace a bathtub with a walk-in shower?

One of our most common conversions: the drain position and slope are recalculated, floor waterproofing renewed and the glass panel made to measure.